Case study
Mainframe ADR
For a Global Bank, the annual assured disaster recovery exercise on its IBM Mainframe infrastructure is among the most high-stakes operational events of the year.
This case study follows the full four-day exercise, featuring a phased shutdown in the primary data centre, a controlled restart in the secondary, and a complete reversal back, all executed with zero customer impact. It shows how meticulous sequencing and real-time coordination turn what could be a catastrophic failure point into a repeatable, confidence-building process.
Download the case study